2019-20 Seal Coat Pavement Improvements
2019/20 Seal Coat Pavement Improvement Project
Construction is currently planned to start Spring of the 2021 construction season. Depending on contractor availability the project may begin Fall of 2020. Project completion date of July 16, 2021.
During construction, there will be periods of time where access to driveways will be denied to accommodate the repair and replacement of the roadway. Intersections and the roadway under construction will be closed in phases. See the current phasing plan. See resident information letters for Franklin Ave and East 8th Street.
For more information or questions about the project, please contact Engineer Dean Sayre with questions via email or 515.239.5277.
Project Areas
Franklin Ave (Lincoln Way to West St) Phasing MapReconstruction: New curb and Gutter, Asphalt Surface, ADA Sidewalk Ramps, Driveway Approaches, Utility repairs.
Franklin Ave (West St. to Woodland St)
Reconstruction: New Curb and Gutter, Asphalt Surface, ADA Sidewalk Ramps, Driveway Approaches, and Utility Repairs
Franklin Ave (Woodland St to Oakland St)
Reconstruction: New Curb and Gutter, Asphalt Surface, ADA Sidewalk Ramps, Driveway Approaches, and Utility Repairs
East 8th St (Duff Ave to Carrol Ave)
Reconstruction: Concrete Surface, ADA Sidewalk Ramps, Driveway Approaches, and Utility Repairs